Art Lebermann: June 2008 Archives

Stay Tuned!

| | Comments (0)
It was a long wait for everything to come together, but after lots of hard work last week the SolFocus solar arrays are assembled and in place. This week we're expecting to begin test runs of the equipment and have the installation inspected by the city so we can start operating the solar system.


KGO_Solar-022-1.jpg 
Installing electrical equipment to collect and manage the electricity the SolFocus arrays generate.

KGO_Solar-049-1.jpgPlacing the pre-assembled solar panels on grids, mounted on a rotating base that allows the panels to follow the sun.


KGO_Solar-055-1.jpg
The crew offers guidance as a crane lifts the panel assembly into position.



KGO_Solar-069-1.jpg
Once the panel's in position, the crew gets to work making it secure and connecting the wiring.

KGO_Solar-073-1.jpg
Ready to catch a few rays and put them to good use.

Chief Engineer Joe Talbot was on site yesterday for the installation of the webcam, weather station and remote monitoring, and reports that after the long delays the project is now moving along very fast. We'll have lots more news in the next few days.

About this Archive

This page is a archive of recent entries written by Art Lebermann in June 2008.

Art Lebermann: April 2008 is the previous archive.

Art Lebermann: July 2008 is the next archive.

Find recent content on the main index or look in the archives to find all content.